Centre of Excellence for Cellular Therapy (CECT)

  • Construction of a 2 storey building (with a basement) in concrete structure relying 2 existing hospital pavilions.
  • Building with an area of ± 3,200 sq. metre with an interstitial floor between the ground floor and level 1.
  • Building made of steel structure used to ease equipment maintenance.
  • Implementation of 97 piles while maintaining hospital pavilion operations.
  • Siding in aluminum and metal.
  • Many special features to seal electromechanical equipments with finished walls and ceilings.

Features

  • Activity Sector Institutional
  • Client Maisonneuve-Rosemont Hospital
  • Year 2010-2012
  • Value $11,000,000
  • Engineers GENIVAR / Aecom Tecsult Teknika HBA
  • Architect Jodoin Lamarre Pratte et Ass./NFOE et Ass./Corriveau Girard
  • Realisation Mode General Contractor