B1 Ambulatory Centre – CHUM

Construction of the B1 ambulatory center of the new University of Montreal Hospital Center (CHUM). The project includes 5 buildings that cover a total area of over 2,766,300 sq.ft. As an emblematic project of the 21st century in Quebec, the CHUM is the most important PPP project in Canadian history and is one of the most publicized projects in the history of construction in Quebec. The B1 Ambulatory Center building alone covers 645,800 sq. ft. It has 20 floors above ground and 4 underground levels. The building houses 772 single rooms, as well as operating rooms, emergency rooms, the sterilization center, the radiology services and the radiotherapy services. EBC acted as general contractor for the architectural and structural works and as construction manager for the mechanical, electrical and plumbing works. The installation of the medical equipment was also part of EBC’s mandate. EBC’s role consisted of supporting Collectif Santé Montréal (CSM) from the design phase to the delivery of the building.

  • Basements excavated in the rock and surrounded by molded retaining walls.
  • Two mechanical rooms on 2 floors each.
  • 10 elevators and two (2) “VAG” freight elevators in three (3) different shafts.
  • Construction of a thermal power station and a power station.
  • Reduction in water consumption greater than 30% and optimization of energy performance by 40%, through the use of thermal wheels.
  • Choice of ecological materials with low VOC content.
  • A LEED® Silver certification is targeted.
  • Project of the Year Award, Grand Prix du Design, APDIQ, 2018.
  • Best indoor hospital space in the world, Health and Education category, WAF, Berlin 2017.
  • First Prize, Best of Canada Design Competition, Canadian Interiors, 2017.
  • Gold Award, Funding Category, Canadian Council for Public-Private Partnerships (CCPPP) 2012.
  • Grand Prize for the best transaction of the year, Project Finance International, 2011.

Features

  • Activity Sector Institutional
  • Client Collectif Santé Montréal
  • Year 2011-2017
  • Value $233,000,000
  • Engineers GBI Experts-Conseils inc. / Le Groupe Farley / Norda Stello
  • Architect Cannon Design / NEUF Architectes
  • Realisation Mode General Contractor
  • Other Stakeholders Synergis inc.